Book an appointment with KRC MATSHEGO T/A Futuristic and Co (pty) ltd
(0)
Book now

About KRC MATSHEGO T/A Futuristic and Co (pty) ltd

Professional Services Appointment: Appointment/ Virtual Meeting (Microsoft Teams); Cash Backed/ Secured Puts; Covered Calls. Cost Estimator: Virtual Meeting (Microsoft Teams)

Cancellation policy

No refund.

Parking instructions

N/A

Opening hours

Monday
09:00-17:00
Tuesday
09:00-17:00
Wednesday
09:00-17:00
Thursday
09:00-17:00
Friday
09:00-17:00
Saturday
Closed
Sunday
Closed

Directions

Services

package image
ZAR 2,500.00

ProfessionalServiceAppointment

Professional Services Appointment: Appointment/ Virtual Meeting (Microsoft Teams); Cost Estimator: Virtual Meeting (Microsoft Teams) Options: Cash Backed/ Secured Puts; Covered Calls.

package image
ZAR 100.00

Cost Estimator

Cost Estimator: Virtual Meeting (Microsoft Teams)

package image
ZAR 100.00

Cost Estimator

Cost Estimator Provide: Estimation work, Bill of Quantities (BOQ) and Material take off. Price $x(-0%) Weekly Fees $xM (+0%) Exchange Flows $xM (-$M) We receive full technical and engineering support on Design, Installation and Commission of Structural Works from Los Angeles company called Futuristic and Co Our team of structural engineers and cost estimators can help with cost, planning, design and preparation of plans for nearly all types of infrastructure and structures. Futuristic and Co (pty) ltd structural team is led by managing director Kamogelo Matshego. A construction manager and senior design and cost estimator skilled at performing structural analysis and design for new construction, rehabilitation, and widening of concrete and steel fixed, movable, structural, plumbing, electric and railroad structures. Preamble. Phase 1. Aim and Objective Explanatory Notes. Budget Proposal Action Plan. Engineering Productivity - Schedule a Quick Demo Measure engineering team performance in minutes. Detect productivity issues & bottlenecks. Set goals to improve engineering productivity & use retrospectives Eto: application-deployment tool enabling infrastructure as code. Engineered to order (ETO) projects are based on specific customer requirements; due to the complex nature of the end-product, the whole process needs to be precise and good communication with the team members and clients throughout the process will help ensure the specifications are met. Material take off (MTO) is the process of analyzing the drawings and determining all the materials required to accomplish the design. Thereafter, the material take off is used to create a bill of materials (BOM). Material Take Off Estimate Bill of Materials (BOM) Proposal At Market/ at cost Basis of Estimate (BOE) is characterized as one deliverable that defines the scope of the project, and ultimately becomes the basis for change management. Basis of Estimate (BOE) deliverable.

package image
ZAR 150.00

Promo: Google Play Card